Solar for industry

Cut the cost of every daytime unit.

Rooftop plants for factories and warehouses, engineered by power-system specialists. Sized against your tariff structure, not just your roof.

typical industrial plants
100 kW to 1 MW
Varsha Cables, Hebbal
595 kW
first-year depreciation (see below)
40%

Largest size offered: the current site says both 1 MW and 2 MW. confirm

Aerial view of a long industrial sheet roof covered with Powergate solar panels
Industrial rooftopAerial survey

Tax

Accelerated depreciation.

Solar power plants have qualified for accelerated depreciation of 40% of the cost in the first year on the written-down-value method under the Income-tax Rules, with the balance written off in later years. For a profitable business this brings a large part of the tax benefit forward.

Tax rules change, and the new Income-tax Act applies from April 2026. Please confirm the rate and eligibility for your assessment year with your chartered accountant. The calculator on this page does not include any tax benefit.

Your tariff

Energy, demand and time-of-day charges.

An industrial bill has several parts, and solar affects each one differently:

  • Energy charges. Every solar unit used on site replaces a unit you would have bought. This is where most savings come from.
  • Time-of-day (ToD) rates. HT tariffs price units differently by time of day. Your plant's output should be checked against your ToD slots, because a midday solar unit can be worth different amounts in different slots.
  • Demand charges. These depend on your maximum demand. Solar alone may not reduce them if your peak comes early morning or evening, so check your load profile before counting on any demand saving.

Current KERC tariffs: CESC electricity tariff page.

Aerial view of Powergate solar arrays across several connected factory roofs

Ready for storage

Battery-ready from day one.

Batteries can shift solar energy into your evening peak and cover critical loads during outages. If storage is not in this year's budget, the plant can be designed so it is added later without rebuilding:

  • Inverter and switchgear choices that support adding storage
  • Space and cable routes reserved for a battery room or container
  • Metering and monitoring that show where storage would pay back

Powergate also builds integrated and modular hybrid systems for sites that need backup today.

Delivery

How an industrial project runs.

Phase 1: Feasibility

  • Detailed site analysis
  • Preliminary engineering
  • Technology selection
  • Feasibility report

Phase 2: Turnkey project management

  • Detailed project report and regulatory assessment
  • Detailed plant and structural engineering
  • Procurement, construction and inspection
  • Commissioning, grid connection and acceptance testing

Projects

Large plants we have built.

Industrial year

Varsha Cables

Hebbal Industrial Estate, Mysuru

System size
595 kW
Generation per year
units/yr
Commercial year

KPR Hyundai

Hunsur Road, Vijayanagar 1st Stage, Mysuru

System size
145 kW
Generation per year
units/yr

Estimate

A first number for your plant.

For industrial sites the survey matters more than usual: tariff category, ToD slots and load profile change the answer.

Type of building
I know my

Use an average over the year if you can. Your CESC bill shows both amount and units.

Change cost per unit

Bill amount divided by units. Default is our assumption: ₹7.5 home, ₹9.5 commercial, ₹8.5 industrial.

Enter your monthly bill or units to see an estimate.

Questions

Industrial solar FAQs.

Will solar make my electricity bill zero?

Usually not, and you should be wary of anyone who promises it. A well-sized on-grid system can cover most of the units you use, but fixed charges, taxes and night-time or monsoon consumption still appear on your bill. What changes is that the energy part of your bill drops sharply for 25 years or more.

What is net metering and who applies for it?

A net meter records the units you draw from the grid and the surplus solar units you send back, and your electricity supply company (CESC in Mysuru) bills you for the difference. We prepare and follow up the application and meter change for you as part of the project.

Can businesses and factories get a subsidy?

The PM Surya Ghar subsidy is only for homes and housing societies. Businesses usually benefit instead through tax: solar plants have qualified for accelerated depreciation of 40% in the first year under the Income-tax Rules. Please confirm the rate for your assessment year with your chartered accountant.

How much maintenance does a solar system need?

Very little. Panels need regular cleaning with water (dust reduces output), and the inverter, wiring and earthing should be checked periodically. We offer annual maintenance contracts that cover cleaning, performance checks, fault diagnosis and repairs.

Get started

Plan a plant for your factory.

An engineer visits, checks your roof and electrical panel, reads your bills and gives you a written proposal. confirm whether the survey is free

  • Sized for your roof and your real consumption
  • Clear cost, generation and payback figures
  • Net-metering paperwork handled by us
Call sales+91 94480 65873 WhatsApp+91 94480 65873

Office hoursMonday to Saturday, 9:30 am to 5:30 pm. Sunday closed.

Request a site survey

Takes about a minute. We call you back during office hours (Monday to Saturday, 9:30 am to 5:30 pm.).

10-digit mobile. WhatsApp works too.

Type of building

Helps us size the system before we visit. JPG, PNG or PDF, up to 5 MB.

Add email or a note (optional)

We only use your details to contact you about this request.